CONTRACTOR: Miller Brothers Construction
PRODUCER: M&R Ready Mix
OWNER: Ohio Department of Transportation
PRODUCTS USED: OptiFlo® 500, UltraFlo® 5600, OptiFlo® MR, ConAir®
The new Damascus Bridge project broke ground in 2015, to replace the aging bridge crossing the Maumee River. The $11.6 million bridge replacement project was done by Miller Brothers Construction, the Ohio Department of Transportation’s contractor, out of Archbold, Ohio. The new bridge features a 12-span pre-stressed concrete I-beam structure over the river with a widened deck to accommodate two 12-foot lanes and two 10-foot shoulders. Construction was completed in 2017.