Crider Road Bridge

Mansfield, Ohio

APPLICATION: Reinforced Concrete Bridge Deck

CONTRACTOR: Mosser Construction

ENGINEER: Richland County Engineers

PRODUCER: Moritz Materials

PRODUCTS USED: UltraFinish 1L

The Crider Road bridge was placed using ODOT specs. Moritz Materials used their state-approved JMF mix Design. UltraFinish 1L Nano Silica Admixture was used in lieu of the 7-day continuous wet cure process.