The Olt Road bridge is the first bridge deck in Allen County, Ohio to use both UltraFinish™ 1L and Impede® IntraSeal together. This combination improves impermeability results over standard concrete, and research has shown that this combination performs equally, or better than, a topically applied curing compound. In addition, the RILEM absorption test confirms this deck shows zero water penetration at 28 days.
The Olt Road bridge is the first bridge deck in Allen County, Ohio to use both UltraFinish™ 1L and Impede® IntraSeal together. This combination improves impermeability results over standard concrete, and research has shown that this combination performs equally, or better than, a topically applied curing compound. In addition, the RILEM absorption test confirms this deck shows zero water penetration at 28 days.